About 30 people, including the Bozeman Climbing Team, showed up to revamp the Gallatin Tower trail on Saturday. The Forest Service came out and supplied all the tools and a chain saw. We made large platforms at the base of all the climbs, re-worked some of the existing trail, and finished the trail to the top of the Tower. A few people stayed out and climbed in the rain. Thanks everyone!
| Attachment | Size |
|---|---|
| Bill.JPG | 35.88 KB |
| Bozeman Climbing Team.JPG | 31.68 KB |
| Joe Wagner.JPG | 36.99 KB |
| Nate, Conrad.JPG | 29.39 KB |
| Rand, Jeff, Gregg.JPG | 39.15 KB |
